Technoman Group of Companies

Delivering Security,
Sustainability & Excellence

Pakistan's leading industrial energy engineering group. From concept to smooth operation — we power factories, industries and communities with globally integrated professional solutions.

35+ Years Experience
45% Max Energy Efficiency
65+ Solar Projects Done
84,000+ KW Installed Capacity
6 Cities Across Pakistan

About Technoman

25+ Years of Combined
Engineering Excellence

Technoman Group is owned and run by highly skilled Engineers and Technicians, linked to domestic and international organizations, offering "Globally Integrated Professional Solutions" from concept to smooth operation.

Committed to reducing capital and operational costs while improving profitability across gas engines, gas turbines, steam turbines, cogeneration, combined cycle, wind and solar systems.

"Security and Sustainability is the true spirit of all our projects."

— Muhammad Azam, Chief Executive Officer

Our Core Focus

  • Minimum capital investment with maximum return on energy systems
  • Latest global technology brought to Pakistan's industrial sector
  • Maximum possible energy efficiency — up to 45% across systems
  • Power generation, industrial power plants, infrastructure and civil works
  • Joint Venture, PPP and Build Operate Transfer project delivery
  • Full technical support always available for your energy issues

Mission Statement

To set a standard of excellence in engineering services by integrating global skills across diversified engineering and technical disciplines for environmentally sustainable development.

Core Services

Comprehensive Engineering Solutions
from Concept to Operation

Market leader in Renewable Energy, Wind Turbines, Energy Recovery and Co-Generation in Pakistan — with agency agreements and technical collaborations with multinational organizations.

Design & Engineering

Detailed engineering design from basic concepts to full compliance. Feasibility studies, power plant parts designing, and complete electrical system design.

Feasibility Studies Spare Parts Electrical Design
🔥

Energy Solutions

Energy efficiency optimization up to 45%, comprehensive energy audits, waste heat recovery boiler systems, co-generation and combined cycle generation.

Up to 45% Efficiency Energy Audits Co-Generation
☀️

Renewable Energy

Solar powered AC and power generation, wind turbine power generation up to 500KW, and small scale hydro power. Flexible EPC, Lease and PPA plans available.

Solar EPC Wind 500KW Hydro Power
🌿

Environmental Engineering

Environmental protection solutions, industrial waste water treatment and effluent management, and sustainable industrial practice consulting.

Wastewater Treatment Env. Protection
⚙️

Industrial Automation

Building automation, control systems, and communication solutions. Technoman manufactures various control systems and sensing devices for truly tailor-made automation.

PLC Panels MCC/PCC AMF/ATS SCADA
🏗️

Installation & Commissioning

Complete turnkey project delivery for thermal power plants, sugar and cement process plants, diesel and gas generator power plants, solar and wind systems.

Turnkey O&M Re-Manufacturing

Projects & Technologies

Proven Track Record Across
Pakistan's Energy Sector

Pakistan's industrial sector is moving toward independent power generation. Technoman is at the forefront of this transformation — delivering projects on time, within budget, and to the highest engineering standards.

Client / Project Capacity Technology Scope
Chawala Aluminium 2 MW Gas Generator Erection & Commissioning
Jillani Plastic 6 MW Diesel Generator Turnkey — Erection, Commissioning, O&M
Jillani Poly Industry 5 MW Diesel Generator Turnkey — Erection, Commissioning, O&M
Jillani Energy Pvt. Ltd. 6.5 MW Coal Fired Steam Turbine Full Turnkey Project
Farooq Spinning 1 MW Diesel Generator Turnkey — Erection, Commissioning, O&M
Layyah Sugar Mills Industrial Boiler Industrial Project Execution

Technologies We Deploy

Coal & Biomass Fired Power Plants

Unique dual-fuel system allowing operation on both coal and biomass — bagasse, rice husk, corn sticks. Full installation including boiler, turbine, and generator with complete pipeline network.

Coal HFO Diesel Biomass Gas

Diesel Power Plants & Heat Recovery

Complete installation with engines imported from foreign partners, equipped with latest AVRs. Heat recovery boilers convert exhaust heat to steam, boosting overall plant efficiency significantly.

Standard
25–35%
With Recovery
40%

Multi-Stage Condensing Steam Turbines

Imported from Peter Brotherhood Ltd — world-renowned manufacturer of steam turbines and turbo-generators. Powering major industrial facilities with reliable, efficient energy generation.

Continuous Pyrolysis & CFB Boilers

Latest waste-to-energy conversion technology. Circulating Fluidized Bed boilers support multi-fuel operation and fuel switching without interrupting production.

Projects Under Progress

9 active projects currently under construction — combined pipeline capacity of approximately 15.65 MW

Magna Textile & Processing
6 MW Under Construction
Al Hamra Fabrics
3 MW Under Construction
Fresh Flour / Aziz Flour Mills
2 MW Under Construction
Al Karam Paper Mills
1.5 MW Under Construction
Ideal Fabrics
1.2 MW Under Construction
Sultani Elasto & Faisal Mustafa Textile
1 MW ea. Under Construction
Rainbow Cash & Carry
650 KW Under Construction
Amanah Mall
300 KW Under Construction

Renewable Energy

Powering Pakistan's Future
with Clean Energy

Pakistan is one of the richest countries in renewable energy potential — with maximum sunshine hours and high solar intensity. Technoman is bringing the industrial world into a new era of clean power generation.

65+ Completed Solar Projects
84,000+ KW Total Installed
6 Cities Covered
~15.65 MW Pipeline Under Construction

Flexible Financing Plans

🏭

EPC — Turnkey Solution

Best for: Available Capital

Complete turnkey solar solution for On-Grid, Off-Grid, and Hybrid sites with professional technical design. Full ownership and authority. The most economical long-term approach.

PPA — Power Purchase Agreement

Best for: Zero Upfront Capital

Per-unit fixed price at a discounted rate versus the National Grid. Consumer enjoys savings from day one with zero initial investment. Long-term contracts customized to your needs.

Completed Solar Portfolio — 65 Projects

84,000+ KW Total
# Project Name Capacity (KW) City
1Country Paper Mill2000Sheikhupura
2Sultani Elasto Products1500Faisalabad
3Bin Farooq Textile Mills Ltd1150Faisalabad
4Jameel Rice Mills1100Bahawalnagar
5Zamurd Rice Mills1000Bahawalnagar
6Rehmat Rice Mills960Mandi Sadiq
7Ghulam Rasool Textile Mills Ltd950Faisalabad
8Bahoo Spinning Mills Ltd950Faisalabad
9Pak Rice Mills908Bahawalnagar
10Rana Weaving Factory860Faisalabad
11Al-Hamd Rice Mills Unit-1770Minchanabad
12New Pak Rice Mills760Bahawalnagar
13Ajwa Textile Mills750Okara
14Bilal Rice Mills700Bahawalnagar
15MS Rice Mills700Bahawalnagar
16Hafiz Azam Enterprises700Faisalabad
17Chaudhary Rice Mills625Okara
18Ghulam Murtaza Textile Mills600Faisalabad
19Imtiaz Zeeshan Textile Mills Ltd590Faisalabad
20H Ali Nawaz Rice Mills580Okara
21Karam Rice Mills575Depalpur
22Farbstoffe International550Faisalabad
23Al-Hasnain Cotton550Faisalabad
24Tallat Rice Mills530Mandi Sadiq
25Al-Hamra Fabrics Pvt Ltd.500Faisalabad
26Indus Rice Mills420Bahawalnagar
27Nazeer Ishtiaq Rice Mills413Bahawalnagar
28Three Star Rice Mills410Bahawalnagar
29Al Rehmat Rice Mills400Bahawalnagar
30Mubarak Textile Mills400Faisalabad
31Abaid Tex400Faisalabad
32Bismillah Weaving400Faisalabad
33Taj Rice Mills400Depalpur
34Al-Hamd Rice Mills Unit-2400Havaeli Lakha
35Eitmaad Rice Mills370Bahawalnagar
36Ghulam Rasool Cotton Mills320Faisalabad
37Fine Star Processing310Faisalabad
38Zoraiz Rice Mills300Kamalia
39Meharban Textile Mills Ltd300Faisalabad
40Ali Enterprises300Jhang
41Anum Enterprises293Faisalabad
42Star Tex Mills285Faisalabad
43Waqas Mukhtar Weaving280Faisalabad
44Malik Naveed Weaving280Faisalabad
45AHS Weaving280Faisalabad
46Hanzla Industries266Dijkot
47Javaid Weaving200Faisalabad
48Hafiz Safdar Weaving200Jhang
49Zaheer U Din Weaving180Faisalabad
50Pak Pharmaceuticals175Faisalabad
51Nouman Shahzad Weaving150Faisalabad
52Umer Cotton Waste Plant140Faisalabad
53Talha Soap130Faisalabad
54Kisan Oil Mills122Khushab
55Asif Weaving120Faisalabad
56Bao Rafiq Weaving120Jhang
57MZ Rice Factory120Bahawalnagar
58Orient Oils Pvt Ltd.110Karachi
59Maguari Textile110Faisalabad
60Sadam Usman Weaving100Faisalabad
61Tahir Weaving100Faisalabad
62Taj Weaving85Gojra
63Sultani Houses70Faisalabad
64Hamza Mukhtar Poultry Farm70Kamalia
65Taj Rafique Weaving60Faisalabad

Our Valued Clients

Built on Trust, Quality
& Consistent Delivery

Technoman Group proudly serves a diverse portfolio of industrial, commercial, and institutional clients across Pakistan's energy landscape.

Power & Energy

  • Pakistan Rice Mills Ltd Power Plant
  • Jilani Energy Power Plant (6.5 MW)
  • Jilani Poly Diesel Generator (3 MW)
  • Jilani Plastic Diesel Generator (3 MW)
  • Jilani Poly Fuel Plant
  • Pak Hero Generator Power Plant
  • Roshan Steel Generator
  • Thar Sugar Mill Pvt Ltd

Textile & Industrial

  • Al Hameed Dying Pvt Ltd
  • Fazal Younas Dying Pvt Ltd
  • Chawla Group of Industries, LHR
  • Farooq Spinning Group
  • IFF Garments Industry, Karachi

Institutional & Energy

  • Allied Hospital, Faisalabad
  • Aziz Fatima Trust, Faisalabad
  • United Ethanol, Sadiqabad
  • Green Fuel CNG, Lala Musa
  • Kent Group of CNG, Mansehra
  • Gul Petroleum, Mansehra
Power Generation Textile Steel Sugar Healthcare CNG Petroleum Pharmaceuticals Rice Processing Paper & Pulp

Leadership & Team

The Experts Behind
Our Excellence

Our leadership team brings together decades of combined experience in the energy, oil field, and construction sectors — fostering a culture of safety, innovation, and operational excellence.

MA

Muhammad Azam

Chief Executive Officer

Leads the company's strategic vision, operational excellence, and business development across all energy and infrastructure verticals. Drives sustainable growth and ensures delivery of best-in-class energy solutions across Pakistan and beyond.

MG

Muhammad Sohail Ghafoor

Director Commercial & Marketing — Mech. Engineer

Highly skilled engineer trained in creating detailed drawings for power plants. Strong command in designing combustion engines, steam and gas turbines. Maintains heavy-duty machines like boilers, turbines, pumps, compressors, and blowers.

MU

Muhammad Usman Ali

Director Technical — Electrical Engineer

Key figure with deep expertise in solving complex problems in the field of electrical engineering. Highly developed problem-solving skills with a drive to always deliver at the highest potential level.

Ready to Power Your Success?

Contact us today for a free consultation. Our technical team is always available for your energy challenges.

Get Free Consultation

Contact Us

Get In Touch

We're Ready to Help

📞
Phone

+92-41-8524243
+92-303-2174874
+92-302-8658338

✉️
Email

sales@technomanenergy.com
technomansolarenergy4@gmail.com

📍
Address

CC-5, Block F, Commercial Market,
Eden Valley, Faisalabad, Pakistan

Why Technoman

  • 35+ years of combined engineering experience
  • Globally integrated professional solutions
  • Turnkey project delivery capability
  • Multinational technical collaborations
  • Market leader in renewable energy in Pakistan
  • Zero LTI safety record

Send Us a Message